News On 6 was told thousands of guests have already been through since Thursday night's soft opening.
The pool should be back by mid-July, and the other downstairs amenities are still under construction for the next few months. The two casinos, theater, hotel, conference center, and restaurants are all back open after a deep clean.
That includes the pool, spa, and fitness center. The casino was forced to close after about a foot and a half of water flooded the lower level. After being closed from flooding for nearly a month, part of the River Spirit Casino and Resort is back open.